The work contracted is the relocation of water and sewer lines, which is needed prior to re-paving of the Ratliff St. This work is scheduled to take between 3 to 4 weeks weather permitting. We ask the public to bear with us and avoid the area when possible. We appreciate their cooperation on this matter.