[ARCHIVED] Completed and On-going Street Projects

City of San Benito 2013 Street Improvement (Reduced List)
approved by City Commission January 22, 2013

*Streets given to Private contractor (Foremost Paving) Engineer Brown & Leal that have been completed:

• Eight blocks of North Travis Street from Business 77 to Batts Street
• 2100 linear feet of McCullough Street from Line 17 to Business 77
• Shafer Road from Oscar Williams Road to Helen Moore Road (FM 509).

*Streets repaired & completed by in-house Street Maintenance Crews
• J. M. Ojeda Road 1,900 ft.
• Six blocks of South Julian Street from the Expressway to Combes Street
• Four blocks of Elva Street
• One and one-half blocks of Juanita Street
• One and one-half blocks of Nava Street
• Five Blocks of W. Frances from North Bowie to North Dick Dowling Street
• Two blocks of West Rose from Palo Blanco to North Travis Street
• Five blocks of West Morelos from Franklin to Hidalgo Street.
• East Stenger Street North side of Street 4 blocks including curb
• Line 17 Road from Sam Houston Blvd to Norma Linda Rd. 4,600 ft.
• Batts Street 1.5 block overlay
• Ballenger Street form Bowie St. to Lee St. 7 blocks
• South Coke Street 1 block
• Adams Street 2 blocks
• Mimosa Circle 2.5 blocks
• Live Oak Circle 2.5 blocks
• Sable Circle 1.5 blocks
• Sunrise Blvd 6 blocks
• Travis Street from Brooks St. to Swanson St. 1.5 blocks
• Williams Street from N. Sam Houston Blvd to N. Dick Dowling St. 3 blocks
• Palo Rosa Street 1.5 blocks
• Centro Street 1.5 blocks
• Ben Lora St. 1 block
• East Rowson Street 1 block (overlay)
• West Rowson Street 1 block (overlay)
• North Lake Shore Drive 1.5 blocks
• Rio Grande Street Bridge rehabilitation
• Rio Grande Street 1.5 blocks


* List of Streets (from the original list) up for repair or Rehabilitation by in-house Street Maintenance Crews

• Walking Trail from bus 77 to Frontage Road (In-house Street Maintenance labor & equipment)
• Skate Park Pad (80 ft. by 30 ft. concrete In-house Street Maintenance labor & equipment) at Stookey Park
• Wetlands Project (In-house Street Maintenance, Sewer Collections Maintenance labor & equipment)
• Adele Street 1 block
• Avon Street 3 blocks
• San Jacinto Street 1.5 blocks
• Charlotte Street 1.5 blocks
• Ratliff Street 1.5 blocks (Water & Sewer Infrastructure LNV Engineering & rehabilitation by GO Underground Contractors)
• S. Fannin Street 7 blocks
• S. Bowie Street 7 blocks
• S. Coke from Ballenger St. to Turner St. 5 blocks
• Franklin Street 4 blocks
• W. Carol St. from Franklin St. to Corral St. 4 blocks
• W. Bravo Street 7 blocks (Water & Sewer Infrastructure LNV Engineering & rehabilitation by GO Underground Contractors)
• E. Powers Street 2 blocks (Water & Sewer Infrastructure LNV Engineering & rehabilitation by GO Underground Contractors)
• Mae Drive 2 blocks (Water & Sewer Infrastructure LNV Engineering & rehabilitation by GO Underground Contractors)
• W. Heywood Street 1 block (Water & Sewer Infrastructure LNV Engineering & rehabilitation by GO Underground Contractors)
• Whalen Road from Frontage Road to Shafer Road